The last tasks on the left elevator are to roll and rivet the leading edge and to install the rod end bearings. This is a repeat of what was done for the right elevator. Here are some pictures from this session:



The last tasks on the left elevator are to roll and rivet the leading edge and to install the rod end bearings. This is a repeat of what was done for the right elevator. Here are some pictures from this session: